“Pakistan is putting renewed pressure behind two of CPEC’s most important transport projects: the Main Line-1 railway upgrade and the realignment of the Karakoram Highway.” “The focus is increasingly extending beyond the original China-Pakistan transit function. Government planning documents and recent statements place the two projects within a wider effort to improve freight movement, lower logistics costs and strengthen Pakistan’s role in regional trade.” “ML-1 is the largest railway modernisation project under CPEC. The CPEC Secretariat lists the planned upgraded and dualised route at 1,733 kilometres, running from Karachi to Peshawar and including the Taxila-Havelian section…” “The Karakoram Highway project is driven partly by geography. Construction of the Diamer-Bhasha Dam requires sections of the existing KKH to be relocated. Under the current phased plan, Phase-II(A) will relocate the highway from Thor Nullah to Raikot over 102 kilometres, including 88 kilometres of new alignment and 14 kilometres of link roads.” “Phase-II(B) covers another 139 kilometres of existing KKH, including sections from Thakot to Dasu and Sazin to Thor Nullah. Pakistan and China have agreed on an 85:15 financing arrangement, with efforts continuing to finalise the financing agreement.” “ML-1 can connect Karachi’s port infrastructure with major industrial and population centres across Pakistan. The KKH, meanwhile, links northern Pakistan with China through the Khunjerab border.” https://thedailycpec.com/pakistan-fast-tracks-ml-1-and-kkh-as-cpec-routes-shift-toward-regional-trade/